Connectivity
Business internet access — from full-fibre broadband to dedicated leased lines, with resilience and failover built in.
01Overview
Connectivity is the circuit everything else runs on. The right choice is a trade-off between cost, guaranteed bandwidth and how much downtime the business can absorb. The categories below behave differently — a contended broadband service and a dedicated leased line are not the same product at a different price.
- access types
- FTTP full fibre · SoGEA / FTTC · dedicated leased line (fibre ethernet) · cable
- bandwidth
- Broadband: asymmetric down/up. Leased line: symmetric, up/down matched
- contention
- Broadband is contended (shared). Leased line is dedicated 1:1, uncontended
- resilience
- Single circuit · dual-circuit diverse routing · 4G/5G automatic failover
- assurance
- Dedicated products carry service-level agreements and target fix times
- install lead time
- Broadband typically 2–4 weeks · leased line typically 30–90 working days — subject to carrier and site survey
02What’s included
From order to ongoing support.
- 01
Site survey & design
Line checks, capacity and resilience design for the actual premises before anything is ordered.
- 02
Provisioning & install
Circuit ordering, carrier coordination and a managed install to the demarcation point or router.
- 03
Router & handover
Configured edge router where required, with the working service handed over and documented.
- 04
Ongoing support
Fault logging, carrier escalation and a single point of contact for the life of the circuit.
03How to choose
The questions that actually decide it.
How much guaranteed upload do you need?
Cloud backups, VoIP and hosted desktops lean on upload. Contended broadband upload is best-effort; a leased line guarantees it symmetrically.
What does an hour of downtime cost?
If the answer is 'a lot', resilience — diverse second circuit or 4G/5G failover — stops being optional.
Is the bandwidth shared?
Broadband contention means peak-time slowdowns. A dedicated line removes contention entirely at a higher cost.
Are you fixed or moving soon?
Leased-line install timescales reward planning ahead; broadband suits shorter horizons or interim sites.
04FAQ
Straight answers.
What's the real difference between broadband and a leased line?
How long does a leased line take to install?
Can we avoid downtime while switching provider?
What is failover and do we need it?
Do you support SD-WAN across multiple sites?
Get connectivity scoped.
Tell us your sites and what you're trying to fix. We'll come back with the right mix and clear next steps.